BIBA - Bakki
The RWY 03/21 grass landing strip surface has been compacted (May 6th 2020)


BIBL - Blönduós
BIBR - Búðardalur
The landing strip surface has been compacted. (May 15th 2020)
BIDV - Djúpivogur

The landing strip surface has been compacted. (May 18th 2020.

The surface is rough.  Fine gravel is missing in runway end 35.

BIEH - Einiholtsmelar

BIFM - Fagurhólsmýri

The landing strip surfacee has been compacted. (May 18/5).
BIFL - Flúðir
The landing strip surface has been compacted. (May 15th 2020)
BIGS - Grímsstaðir

BIHL - Hella

RWY 03/21 and RWY 11/29 landing strips surface have been compacted (May 6th 2020)

BIHE - Herðubreiðarlindir


BIHK - Hólmavík

The landing strip surface has been compacted. (June 4th 2020)

BIHZ - Húsafell

The landing strip surface has been compacted (May 19th 2020)

BIHI - Hveravellir

The landing strip surface has been compacted. (June 12th 2020)

BIKA - Kaldármelar

The landing strip surface has been compacted. (May 15th 2020)

BIKE - Kerlingarfjöll

The landing strip surface has been compacted. (June 12th 2020)

BIKL - Kirkjubæjarklaustur

The landing strip is closed the next two weeks. (June 16th 2020)

BIKP - Kópasker

The landing strip surfacee has been compacted and is in good condition. (May 2 2020).

BIMM - Melgerðismelar

The landing strip was mowed and is in good condition. (June 24th 2020).

BIMK - Múlakot

BINF - Norðfjörður

The landing strip has been compacted (June 16th 2020).

Damage on the landing strip, 40 meters from the rwy 08 threshold.  The damage is 4 meters wide.

BIND - Nýidalur

Because of snow the landing strip has not been opened. (June 12th 2020)

BIRG - Raufarhöfn

The landing strip has been compacted.  (May 3 2020).

The gravel is unfirm. 

BIRE - Reykhólar

The landing strip has been compacted (June 4th 2020)


BIRL - Reykjahlíð

BIRS - Reykjanes

The landing strip surface has been compacted. (July 7th 2020).

The surface is rough and loose.


BIRF - Rif
RWY 11/29 grass landing strip surface has been compacted (May 15th 2020)


BISA - Sauðárflugvöllur

Sauðárlandingstrips was opened Juni 2 2020.  The landingstrips are in good condition.

BISF - Selfoss

BISL - Skaftafell

The landing strip surface has been compacted. (April 18th 2020)

BISV - Skálavatn

Landing strip surface has been compacted. (June 12th 2020).

BISK - Skógasandur

Landing strip surface has been compacted (May 6th 2020)

BIST - Stykkishólmur

The landing strip surface has been compacted (May 15th 2020)

BIMS - Tungubakkar

BIVI - Vík

The landing strip surface has been compacted (May 6th 2020)

BITE - Thingeyri


BITM - Þórsmörk

The landing strip surface has been compacted (May 6th 2020)